Room is the one thing a newer Surrey lot is not short of. What runs out first is the share of it the zoning bylaw lets you build on, and the distance it wants kept between the house and anything standing on its own. Both get settled before a system is chosen.

City of Surrey

Shade Screens, Retractable Awnings & Patio Covers in Surrey

Room is the one thing a newer Surrey lot is not short of. What runs out first is the share of it the zoning bylaw lets you build on, and the distance it wants kept between the house and anything standing on its own. Both get settled before a system is chosen.

The arithmetic before the catalogueFloor area and lot coverage worked out against your zone and your lot size before a footprint is agreed.
Residential & commercialWide suburban decks and pool yards, through to town centre restaurant patios and strip commercial frontages.
Specified to the addressThe building code carries two design locations inside Surrey's boundaries. We use the one that matches where the property actually is.
Siting settled earlyWhere a freestanding structure is allowed to stand here is a measured question, and it comes first rather than last.
Motorization & automationSomfy and Gaposa control, with limits and sensor thresholds set on the day rather than left as they arrived.
Warranty registrationYour manufacturer warranty is registered for you at handover, and the full terms sit on the warranty page.

What a Large Surrey Lot Gives You, and What the Bylaw Takes Back

Seven things shape a project in this city. Five are figures or clauses anyone can open and read for themselves, and two are our own reading of what they mean once somebody is standing in the yard with a tape measure. Each one says which it is. Every municipal figure comes from a City of Surrey document accessed 20 September 2026, and not one of those figures decides anything about your particular lot.

Surrey hands you the back yard and then charges you for roofing part of it. Zoning Bylaw 12000 counts covered outdoor space above 1.8 metres inside the floor area ratio, counts outdoor covered areas inside lot coverage, and in the R3 zone cuts the percentage of the lot you may cover as the lot gets bigger. So on the large newer lots this city is full of, the opening question is not which roof you want. It is how much of the lot that roof is allowed to spend, and where the bylaw will let it stand.

01

The code table carries two design locations inside Surrey's boundaries

Appendix C of the BC Building Code lists a station called Surrey (88 Ave & 156 St.) at 90 metres elevation, and a separate Cloverdale station at 10 metres. The table is a list of communities rather than a list of municipalities, and it never states that Cloverdale sits inside the City of Surrey. That part is ours to know rather than the code's to say. The Surrey station carries a 2.4 kPa ground snow load at the 1-in-50 return period, with 0.3 kPa of associated rain load. Cloverdale carries 2.5 kPa and 0.2 kPa. Our view, and we mark it as ours, is that a structure should be specified against the design location matching the address rather than against whichever row somebody defaulted to first. These are code values. The City of Surrey publishes no design snow load, wind pressure or rainfall figure of its own.

02

Water is what moves between those two rows, and it moves a fair distance

Annual rain at the Surrey station is 1,500 mm against 1,350 mm at Cloverdale. Total annual precipitation is 1,575 mm against 1,400 mm. The one day rain at the 1-in-50 return period is 128 mm against 112 mm, while the 15 minute rain is 10 mm at both. What we take from that is unglamorous and useful: a roof put over a wide deck is a large new catchment, and how much it has to move on the worst day of the year depends on which end of the city it is in. So the gutter section, the number of outlets and the point where the water is finally put down get drawn with the roof rather than added to it afterwards.

03

Wind is the one figure that does not move here

Hourly wind pressure at the Surrey station is 0.33 kPa at the 1-in-10 return period and 0.44 kPa at 1-in-50. Table C-2 gives Cloverdale, Langley, New Westminster and White Rock that same pair of numbers. We report it because a frame has to be designed against it, and then we leave it alone, because a reference pressure tells you nothing about one particular back yard. Shelter does, and shelter is something read standing on the property rather than something anybody publishes.

04

A roof over outdoor space is counted as floor area, with an allowance before it bites

In the R3 zone the bylaw requires covered outdoor space with a height of 1.8 metres or greater to be included in the floor area ratio calculation, except for a maximum of 10 per cent of the maximum allowable floor area, of which 10 square metres must be reserved for a front porch or veranda. The area of an accessory building over 10 square metres is included as well. The equivalent clause appears in the RA, R1 and R2 zones. Separately, the bylaw's Part 1 definition of floor area ratio excludes balconies, canopies, terraces and decks from floor area, and those two provisions sit in some tension, so which one governs a specific structure is a question for the City. What we take from it, marked as ours, is that there is real room before a cover starts spending density, and that on a house already near its ceiling the sum is worth doing before choosing between an attached cover and something standing on its own. Confirm your own numbers with Surrey.

05

The bigger the lot, the smaller the share of it you may cover

This is the Surrey number that behaves backwards from how people expect. In the R3 zone a single family dwelling with or without a secondary suite may cover 40 per cent of a lot of 560 square metres or less. Above 560 square metres the allowance is reduced by 2 per cent for every additional 93 square metres until it reaches 25 per cent, and any lot greater than 1,262 square metres is held to 25 per cent. The same table is more generous where a coach house or garden suite is present, at 50 per cent reducing to 30 per cent. The bylaw's definition of lot coverage names outdoor covered areas alongside buildings and structures and measures within the supporting elements, which on an open structure means the posts, while excluding anything whose top sits no more than 0.6 metres above grade. Our reading, and we mark it as ours, is that a rear yard out here can be generous in metres and tight in percentage at the same time, which is exactly the situation where the sum belongs in the first conversation.

06

Too much shade is not a reason Surrey will issue a tree permit

The City publishes the reasons it will issue a tree cutting permit and the reasons it will not, and too much shade sits on the second list, alongside debris in the gutters, leaf and fruit drop, moss growth on the roof, driveway and sidewalk damage, fence lifting, root interference with the lawn and wanting a better view. A permit is required to remove or re-top any tree at least 30 centimetres in diameter at breast height. Up to two replacement trees may be required for each one removed, the replacement tree deposit is $550 per tree, and the published fine for damaging or removing a tree without a permit runs to $20,000. Surrey also routes a deck permit application past its Trees and Landscape section to determine tree protection requirements. On a treed lot that settles the direction of travel for us: the tree stays, and the shade, the privacy and the rain cover get answered with a structure and a screen.

07

The ditch at the back of the yard may be a regulated stream

Part 7A of the zoning bylaw sets streamside setback areas measured from top of bank by a Qualified Environmental Professional, and it treats a constructed drainage channel as a stream type in its own right. A ditch carries 10 metres on a Class A or A/O stream and 7 metres on a Class B. A stream predominantly in its natural state carries 30 metres and 15 metres. For lots that existed before 12 September 2016 in single family and duplex zoning the bylaw publishes a shorter table, 15 metres for most stream types, and states that subdividing or rezoning the lot puts it back onto the longer one. A great deal of newer Surrey housing backs onto drainage of one kind or another, so where a rear yard ends at water the first thing we want established is which line the setback is being measured from, before a single post position is marked out.

Three System Families, and What a Wide Surrey Deck Does to Each

Each block covers what the system actually does on the kind of lot this city is full of, and then stops. Sizing, brand range and specification detail live on the linked pages on purpose, so that this page never competes with them.

01The first move on a long opening

Exterior Shade & Motorized Screens

A newer Surrey deck usually has one very long open side and nothing mature planted anywhere near it, so the shade problem is horizontal at least as much as it is overhead. Track guided motorized screens close that flank on demand. The fabric runs in a side channel instead of hanging free, it drops to kill glare and to cut the sightline in from the next lot, and it rolls away entirely when nobody needs it. A screen is also a vertical element rather than a roof, and our reading, which is ours and not a City ruling, is that this keeps it clear of the covered outdoor space and outdoor covered area wording a solid cover has to answer. Worth asking the City about early, because on a lot already near its ceiling that can be the whole argument.

  • Track guided, so a long run holds its line instead of bowing out
  • Closes the flank where low light and neighbour sightlines both arrive
  • Privacy where newer houses sit close together and look straight across
  • Retrofits an opening you already have, or builds into a new structure
  • Wall switch, app or sensor driven, depending on how the space gets used
Exterior shade screen systems
A run of motorized exterior shade screens lowered along a covered poolside terrace
02Shade that is not a building

Retractable Awnings

An awning is the option that leaves the yard alone. It projects when you want it and disappears when you do not, which suits a deck worked hard in July and ignored in February. The words awning and pergola do not appear anywhere in Zoning Bylaw 12000, and Surrey publishes no residential projection allowance written for a fabric canopy, so we will not tell you how an attached awning will be treated against a required setback. That one goes to the Building Division, and it is worth asking. What we can settle is the mechanical half: projection against the width you actually have, how the arms are carried at full extension, what the mounting surface will take, and whether fabric and motor seal into a closed cassette between uses.

  • Full width shade that packs away instead of standing over the deck all year
  • Cassette, semi cassette and open frame, each mounting differently
  • Wall face, soffit and beam mounting assessed against your real elevation
  • A wind sensor that retracts the unit with nobody there to press anything
  • Houses, townhouse decks, storefronts and restaurant frontages
See the full retractable awning range
Retractable terrace awning extended over an outdoor dining area
03The one the bylaw actually counts

Patio Covers

A fixed roof, whether it is glazed, polycarbonate or aluminum, is what gives a space a season rather than an afternoon, and in this city it is also the system that has to answer the bylaw directly. It is the thing counted inside floor area once it is 1.8 metres or higher, the thing added to lot coverage, and the thing that has to stand somewhere the zoning will permit. Attached against freestanding is therefore not only a question of how it looks here. A freestanding structure has its own siting distances and its own height cap, while an attached one borrows from the house and puts its load into a wall. We work both versions through before recommending one.

  • Glazed, polycarbonate and aluminum roof options, each needing a different frame under it
  • Floor area and lot coverage checked against your zone before a layout is drawn
  • Fixed to the house, or set out in the yard at whatever separation the zone requires
  • Gutter, outlets and discharge point designed with the roof rather than after it
  • Screens, heat and light built into the same structure from the start
See the patio cover and sunroom range
Glass roofed aluminum patio cover built out above a rear deck and stair

What Else Tends to Join a Surrey Scope

Three short summaries with one link each, rather than three more full sections. In practice at least one of them lands in the scope before a Surrey quote gets signed.

Radiant patio heaters recessed into the ceiling of a covered outdoor space

Outdoor Heating

Shoulder season evenings here turn wet before they turn cold, so once the roof has made a space usable, heat is what decides how many months of the year anybody bothers walking out into it. Infrared output arrives on people and on surfaces, instead of warming air that an open sided structure hands straight back, and built into the frame it takes up no floor area. We found no City of Surrey publication setting a clearance or an approval condition for a permanently mounted outdoor heater, so clearances come from the manufacturer's own model specific figures and from nowhere else.

Bromic outdoor heating >
Motorized roll shutters fitted over residential windows

Roll Shutters & Security

The product page holds the detail. The local note is that the pull here runs two ways. On newer housing it is blackout and heat exclusion across the large west and south elevations this stock is full of. On commercial premises it is a glazed frontage that needs securing after hours. Motorized, and able to sit on the same control platform as the screens.

Roll shutter and security systems >
Overhead view of an adjustable aluminum louvre roof closed over a terrace

Pergolas & Louvered Roofs

The product page keeps this one. The local point is short. Because the bylaw never names a pergola or a louvered roof, a structure like this is assessed against the general definitions rather than against a rule written for it, and in the R3 zone a freestanding one is held to the 4 metre structure height. Worth establishing before a design is drawn rather than after.

Pergola and louvered roof systems >

A Suburban Back Yard and a Town Centre Frontage Are Not the Same Job

Take whichever tab matches the property you are working on.

Motorized screens fitted across the open side of a residential covered deck

Most briefs here start from the same position. Plenty of ground, a wide deck with nothing over it, and a house facing the yard through a great deal of glass. The constraint is almost never space. It is what the bylaw will let a structure use, and where it will let it stand.

Large newer subdivision decks

A big footprint, no planting yet and nothing overhead. This is the most common request in the city, and the one where the coverage sum decides the most.

Pool decks and outdoor kitchens

Where there is genuinely room for a structure to stand clear of the house, which in the R3 zone means holding 5 metres off it once it passes 2.4 metres in height.

Long glazed rear elevations

Intercepting solar gain on the outside face of the glazing with a screen or a shutter, which is a different result from dealing with the heat after it has arrived indoors.

Properties along the farmland edge

Near the Agricultural Land Reserve a lot may carry a registered covenant and a vegetated buffer that stays in private ownership. Part of the yard on paper, unavailable in practice.

Treed lots

Post positions move to keep clear of root zones, and a protection barrier may need to go up before anything is dug.

The question that decides the design

Where a Structure Is Allowed to Stand in a Surrey Back Yard

On a big lot the tempting assumption is that there is room for anything anywhere. Surrey publishes a set of distances that says otherwise, and they are the most useful thing in the whole bylaw for work like ours, because they decide whether a structure can sit by the back door or has to move out into the yard. The clauses are quoted in the approvals section below. What follows is what they do to a design.

Ten square metres is the line that changes the setbacks

Surrey's residential zones publish two separate setback rows for accessory buildings and structures, split at 10 square metres. In the R3 zone, at 10 square metres or less, a structure may sit on the rear and side lot lines, with 18.0 metres to the front and 1.8 metres to a street side. Above 10 square metres the front yard is not permitted at all, and the setbacks become 1.2 metres rear, 1.0 metre side and 3.6 metres street side. In the R1 zone the figures for the larger category are 18.0 metres front, 1.8 metres rear, 1.0 metre side and 7.5 metres street side, and they do not change with lot size. Almost every structure worth building is on the far side of that line.

Five metres between the house and anything freestanding over 2.4 metres tall

In the R3 zone, for accessory buildings and structures over 10 square metres, the bylaw requires a minimum separation of 5 metres between the single family dwelling or duplex and anything exceeding 2.4 metres in building height, including a detached garage or carport whatever its height. It allows that to drop to 3.0 metres for stairs and for an outdoor space such as a deck or patio occupying a maximum of 10 square metres, which may be covered by a roof. The R1 zone publishes the same 5 metre separation. Other zones set the reduced separation area differently, so the zone that applies to the property has to be checked. Whether a particular open cover falls inside that 10 square metre exception is a question for the City, and it is worth asking early, because the answer moves the structure.

Four metres, or five if the roof matches the house

The R3 height table draws a line between an accessory building and a structure. An accessory building must not exceed 4 metres, but may be increased to 5 metres where its roof slope and construction materials are the same as the principal building's. A structure must not exceed 4 metres full stop. That is a design decision sitting inside a height table, and it is the reason a matched pitch and matched materials are worth considering on a Surrey project rather than being treated as purely cosmetic.

Freestanding means out of the required setbacks

Part 4 of the bylaw states that in all zones, unless incorporated as part of the principal building, structures including sheds, platforms and similar structures shall not be sited within the required setbacks, with fences and poles excluded from the requirement. Separately, structures under 0.6 metres in height may encroach. Between those two provisions, Surrey's published position on where something freestanding may stand is clear enough to design against.

What the bylaw counts as a building, and what it counts as attached

A building here means a structure having a roof supported by columns or walls used or intended to be used for the shelter or accommodation of persons, animals or chattels. That definition catches an open structure on posts. Read against the accessory building definition, which requires a detached building to sit at least 1 metre clear of an exterior wall of the house and to be smaller in floor area and lot coverage than the house, it explains why an attached cover and a freestanding one are handled as different animals in this city.

The one projection Surrey does publish, and the one it does not

The Part 1 definition of setback allows eaves, chimneys, hutches, balconies or decks and bay or boxed windows to encroach into a required setback on each storey to a maximum of 0.6 metres. That allowance names no awning and no fabric canopy. So Surrey does publish a projection rule, it simply does not publish one for this product, and we are not going to state how an attached awning is treated when the City has not. Ask the Building Division before anything is ordered.

Aerial view of a louvered roof structure set alongside the rear of a house

Commercial outdoor dining

In Surrey a Patio Roof Is an Engineered Roof, Whatever Its Size

The City runs a named Outdoor Seating Area Permit for eating and licensed beverage establishments, and its published requirements are unusually direct. A fence or a trellis gets a height trigger. A roof gets no trigger at all, because every one of them is caught. The quoted wording is in the approvals section below. What follows is what it means for an operator planning a build.

Every roof needs a structural registered professional

The City states that any proposed fence or trellis greater than 1.8 metres in height and all roofs require the involvement of a Structural Registered Professional, with a Coordinating Registered Professional where there is more than one. There is no square metre threshold underneath the roof requirement. On a commercial patio in this city, engineering is a line in the budget from the first day.

The drawing list repeats it, which tells you where the time goes

Surrey asks for elevation drawings wherever a fence, trellis or roof is proposed, and for sealed and signed structural drawings for any fence or trellis over 1.8 metres, then states again that all roofs require sealed and signed structural drawings. Read that as the City telling you the drawing set is the long pole in the programme rather than the hardware lead time.

Two approvals sit outside the Building Division

The Planning Division determines whether the proposed seating complies with approved development permit conditions for the site, and applicants are advised to consult it before applying. Fraser Health must review the drawings before the building permit application is submitted, and again before a final inspection is requested. Both are sequencing questions rather than technical ones, and both are far easier to absorb at the start of a project than in the middle of one.

Screening the patio in can change the exiting requirement

The City requires an exit gate where the outdoor seating area is enclosed, meeting all the exit and accessibility requirements of the BC Building Code and unobstructed at all times. Screens, glazing and side panels are exactly the point at which a patio can become enclosed, so our practice is to settle with the City what counts as enclosed before the screen package is specified rather than after it is installed.

The footprint is decided by the setback and the sidewalk

An outdoor seating area cannot be located in a required setback from a property line, and the sidewalk around it must not be less than 1.5 metres wide and must remain unobstructed at all times. On a frontage where the building was already put up close to the property line, the setback is usually the binding rule, and what gives way is the seating plan rather than the structure.

Thirty people brings in an architect, and the seats get counted twice

A Registered Architect is required where the occupant load for the entire eating or licensed beverage establishment exceeds 30 persons, which catches more projects than operators expect once the indoor seats are added in. The application also wants water closet calculations based on the total occupant load including the outdoor seats, and calculations showing the required number of parking spaces. On a tight strip commercial site the parking calculation is frequently what decides how many seats the patio can carry at all.

Louvered aluminum roof over a restaurant dining patio

Local planning

What Surrey Publishes, Quoted, With the Gaps Left as Gaps

No City of Surrey document names a patio cover, a pergola, a louvered roof, a retractable awning, a motorized screen or a roll shutter and gives it a threshold of its own. The words awning and pergola do not appear in the zoning bylaw at all. The real limits therefore sit in the Building Bylaw, in the density and siting provisions of Zoning Bylaw 12000, in four land overlays, and for businesses in a named outdoor seating permit. The four panels below quote City of Surrey documents only, accessed 20 September 2026. Treat them as the opening of a conversation with the City, not as a ruling on your lot.

Building permits

Surrey starts from a flat prohibition rather than from a threshold, and the single residential exemption it publishes is written about storage sheds. A covered deck is drawn as a roof from the first submission.

01

The starting point is that a permit is required

Building Bylaw 2012 No. 17850 states in Part 3 that the bylaw does not apply to buildings exempted by the Building Code, except as expressly provided, and then in Part 4 that no person shall commence or continue any construction unless the Building Official has issued a valid and enduring permit for the work. That is a prohibition with one referred exemption behind it. There is no Surrey published square metre figure for a roofed structure below which you are clear.

02

The one published residential exemption is written about storage sheds

The City's residential permit page sets out criteria for building without a building permit, and every word of it describes a shed. The storage shed must have an area of 10 square metres or less, be sited 1.5 metres away from any neighbouring property lines and 3.0 metres away from other buildings on the same property, and the City frames the reason as hazard rather than as size alone. Whether the Building Division reads an open roofed structure of 10 square metres or less the same way is a question to put to them. It is not an assumption to build a design on.

03

Skipping the permit does not skip the zoning bylaw

The same page closes that loop immediately, stating that property owners who construct a shed without a permit must ensure compliance with Zoning Bylaw 12000 for use, density, lot coverage, setback and building height. Two of those five, density and lot coverage, are precisely the ones a roof over outdoor space moves.

04

A covered deck is drawn as a roof from the first submission

Surrey's deck permit guide asks for roof slopes on the elevations where the deck is covered, for lot coverage calculations on the site plan, and for the direction and sizes of all roof structural components including beams and hangers, sealed and signed by a registered professional engineer where engineered beams are used. The City expects the cover to be part of the deck drawing rather than something proposed later. The guide is dated July 2014, so it is used here for what it asks for rather than for any current figure.

05

Every deck application goes past the tree section

The same guide states that the Trees and Landscape Department will also review the application to determine whether there are any tree protection requirements. That is worth knowing before footings are set out, because a protection barrier or an arborist supervision letter can change where a post is physically able to land.

06

An accessory building application shows the numbers before and after

Surrey's detached garage and accessory building guide asks the applicant to indicate existing and proposed lot coverage and floor area ratios. That request only makes sense in a city where a new structure consumes some of both, which in Surrey it does. This guide is dated January 2013 and is used here for process only.

07

Two floodplain neighbourhoods have permit types of their own

Alongside the ordinary residential list, the City publishes a Bridgeview floodplain residential building permit and a Crescent Beach floodplain residential building permit. If the property sits in either, the local process is the starting point rather than the general one.

08

What the City publishes about building without a permit

Surrey runs a named Illegal Construction Enforcement Team and publishes the consequences in detail: fines issued to the property owner and to any contractors or employees present on site, ranging from $400 to $50,000 for each offence; a notice placed on the title of the property under Section 57 of the Community Charter, available to the public including potential purchasers, mortgage lenders and insurance companies; and court orders requiring owners to remove or demolish unpermitted work at their own expense and to pay the City's legal costs. We raise it not to alarm anyone, but because it is the reason we would far rather resolve a borderline structure with the City at drawing stage than at inspection stage.

What applies to a given Surrey property depends on the zone, the lot size, the structure and which of the City's overlays touch it, and several of the questions above have no published answer for an open roof. Five Eight Twelve provides the specification, the drawings and the technical detail an application rests on. Confirming and obtaining City of Surrey approvals stays with the property or business owner.

Before you ask for a number

What the Number Actually Turns On Here

There are no prices on this page. A number with no specification standing behind it is not information, it is decoration. Below is the list we work through before a quote exists. On a Surrey property the second group is the one that most often changes the shape of the answer, and it does so before anyone has picked a finish.

The system itself

Surrey zoning arithmetic

Site and ground

Integration

Approvals and professional input

What your quote will hinge on

Select the factors on the left that describe your project.

  • The system itself
  • Surrey zoning arithmetic
  • Site and ground
  • Integration
  • Approvals and professional input

None of the above is a price list. It is the order a site visit follows, and on a large Surrey lot the second group is usually what decides whether the quote surprises anybody.

Surrey Projects

Surrey project gallery coming soon

There is no Surrey installation published here yet, and we are not going to move a job in from another municipality and let the city name at the top of the page do the work. We are going through which completed local projects can be published with client permission and photography attached. Everything below is product and system photography rather than a Surrey job.

Glazed aluminum patio enclosure built off the rear of a house
Motorized shade screen running down the open side of a covered patio
Retractable terrace awning extended over a paved outdoor seating area

Product and system photography. Not Kelowna or West Kelowna projects.

How a Surrey Project Runs

Seven steps, run the same way in every market we cover. What shifts in Surrey is the weight carried by step two, because the arithmetic and the siting distances between them decide what is even worth drawing.

  1. 01

    Consultation

    Describe the space, how you would like to use it, and the point in the year it stops working. That conversation fixes the scope and narrows the list of systems worth looking at.

  2. 02

    Site and project review

    Orientation and exposure, what you are fixing to, how much floor area and lot coverage the property has left, where a freestanding structure is allowed to stand, what trees and watercourses are nearby, and where a new roof would put its water.

  3. 03

    System and design options

    The options genuinely open on your property, each with its tradeoff stated rather than glossed over.

  4. 04

    Proposal and quote

    A written proposal that names the system, the sizes, the finish schedule, what integrates with what, and what the installation covers.

  5. 05

    Approvals confirmed

    You take the questions this page flags to the City of Surrey and obtain whatever approvals your project needs. We hand over the specification and project information that supports the application.

  6. 06

    Installation

    Delivery and fitting to the agreed specification, with the schedule built around site access and, for a business, around opening hours.

  7. 07

    Handover

    How to run it, the controls commissioned, what maintenance it wants, and the warranty put on record.

Almost everything in a Surrey job is decided at step two. How much floor area and coverage the property has left, and how far a freestanding structure has to be held off the house, both change what is worth designing at all, and both are far cheaper to establish with a tape measure in hand than with a drawing already submitted.

Straight answers

Surrey Questions

Do I need a building permit for a patio cover in Surrey?

Assume yes and get it confirmed. Building Bylaw 17850 states that no person shall commence or continue any construction unless the Building Official has issued a valid and enduring permit, and that the bylaw does not apply to buildings exempted by the Building Code except as expressly provided. The only residential exemption the City publishes on its own permit page is written entirely about storage sheds, at 10 square metres or less, 1.5 metres from neighbouring property lines and 3.0 metres from other buildings on the property. Whether the Building Division reads an open roofed structure the same way is a question for them. No City of Surrey document names a patio cover and gives it a threshold.

Source: City of Surrey, Residential Building Permits

Does roofing my deck count against what I am allowed to build?

In the R3 zone the bylaw requires covered outdoor space with a height of 1.8 metres or greater to be included in the floor area ratio calculation, except for a maximum of 10 per cent of the maximum allowable floor area, of which 10 square metres must be reserved for a front porch or veranda. So there is a real allowance before a cover starts spending density. The area of an accessory building over 10 square metres is counted as well, and the same clause appears in the RA, R1 and R2 zones. Separately the bylaw's Part 1 definition of floor area ratio excludes balconies, canopies, terraces and decks from floor area, which sits in tension with it, so which provision governs a particular structure is for the City to determine. Run your own numbers with Surrey before ordering anything.

Source: City of Surrey, Zoning By-law No. 12000, R3 Zone Section D.3 and Part 1 Definitions

My lot is large. Does that mean I can cover more of it?

As a percentage, no, and this is the part that surprises people. In the R3 zone a single family dwelling with or without a secondary suite may cover 40 per cent of a lot of 560 square metres or less. Greater than 560 square metres and up to 1,262, the allowance is reduced by 2 per cent for each additional 93 square metres until it reaches 25 per cent. Above 1,262 square metres it is 25 per cent. Where a coach house or garden suite is present the table is more generous, at 50 per cent reducing to 30 per cent. The definition of lot coverage counts outdoor covered areas and measures within the supporting elements, so an open structure counts by its posts. Confirm the zone and the arithmetic for your own lot with the City.

Source: City of Surrey, Zoning By-law No. 12000, Part 15 R3 Urban Residential Zone

How far does a freestanding cover have to sit from the house?

In the R3 zone, for accessory buildings and structures over 10 square metres, the bylaw requires a minimum separation of 5 metres between the single family dwelling or duplex and anything exceeding 2.4 metres in building height. It allows a reduction to 3.0 metres for stairs and for an outdoor space such as a deck or patio occupying a maximum of 10 square metres, which may be covered by a roof. The R1 zone publishes the same 5 metre separation, and other zones set the reduced separation area differently. Whether a specific open cover falls inside that exception is a question for the City, and it is the one we would ask first, because it decides whether the structure can sit at the back door or has to move out into the yard.

Source: City of Surrey, Zoning By-law No. 12000, R3 Zone Section F.2

How tall can a structure in the back yard be?

The R3 height table states that an accessory building must not exceed 4 metres, but may be increased to 5 metres where the roof slope and construction materials of the accessory building are the same as the principal building's, and that structures must not exceed 4 metres. That distinction between a building and a structure is worth reading carefully, because an open freestanding cover held to 4 metres and a matched accessory building allowed 5 are different design problems. The figures that govern your own property come from the City rather than from this page.

Source: City of Surrey, Zoning By-law No. 12000, R3 Zone Section G

Can a retractable awning project into a side or rear setback?

We will not answer that one, because Surrey has not. The bylaw's Part 1 definition of setback allows eaves, chimneys, hutches, balconies or decks and bay or boxed windows to encroach into a required setback on each storey up to a maximum of 0.6 metres. It names no awning and no fabric canopy, and the words awning and pergola do not appear anywhere in Zoning Bylaw 12000. So Surrey does publish a projection allowance, it simply does not publish one written for this product. Put the question to the Building Division before the unit is ordered.

Source: City of Surrey, Zoning By-law No. 12000, Part 1 Definitions

What snow and wind figures is a Surrey structure designed against?

Appendix C of the BC Building Code carries two design locations inside Surrey's boundaries. The row headed Surrey (88 Ave & 156 St.) sits at 90 metres elevation, with Ss at 2.4 kPa for the 1-in-50 ground snow load, Sr at 0.3 kPa, hourly wind pressure of 0.33 kPa at 1-in-10 and 0.44 kPa at 1-in-50, a one day rain of 128 mm at 1-in-50 and 1,500 mm of annual rain. Cloverdale sits at 10 metres with 2.5 kPa, 0.2 kPa, the same two wind figures, a 112 mm one day rain and 1,350 mm of annual rain. Ss is a ground snow load rather than a roof design load, so nobody should be quoting it as the number a roof is built to. These are provincial code values. The City of Surrey publishes no design snow load or wind pressure of its own.

Source: BC Building Code 2024, Division B, Appendix C, Table C-2

There is a big tree shading the wrong part of my yard. Can it come out?

Not on shade grounds. Surrey publishes the reasons a tree cutting permit cannot be applied for, and too much shade is on that list, along with gutter debris, leaf and fruit drop, moss on the roof, driveway and sidewalk damage, fence lifting, root interference with the lawn and wanting a better view. A permit is required to remove or re-top any tree at least 30 centimetres in diameter at breast height, up to two replacement trees may be required for each one taken out, the replacement deposit is $550 per tree, and the published fine for removing or damaging a tree without a permit runs to $20,000. Which is a large part of why our answer in this city is usually a structure and a screen rather than a chainsaw.

Source: City of Surrey, Removing Trees

There is a ditch behind my fence. Does that change anything?

It can, and it is worth checking before a post position is marked. Part 7A of the zoning bylaw treats a constructed drainage channel as a stream type in its own right, with a setback of 10 metres on a Class A or A/O stream and 7 metres on a Class B, measured from top of bank by a Qualified Environmental Professional. A stream in its natural state carries 30 metres and 15 metres. For lots that existed before 12 September 2016 in single family and duplex zoning, most stream types drop to 15 metres, and subdividing or rezoning puts the lot back onto the longer table. Which table your property is on is an answer the City holds.

Source: City of Surrey, Zoning By-law No. 12000, Part 7A Streamside Protection

My property backs onto farmland. What does that change?

Possibly the usable depth of the yard, and possibly what is on your title. Surrey's Farming Protection guidelines apply through a development process, so they bind the subdivision rather than a homeowner adding a cover later, but the covenant and the buffer are often already registered and already laid out. Under those guidelines a property within 50 metres of the Agricultural Land Reserve boundary registers a Restrictive Covenant about farm operations, a yard abutting the ALR carries a 30 metre minimum building setback from the boundary and a minimum 15 metre vegetated buffer, a minimum 4.5 metres of rear yard sits between the buffer and the rear face of the dwelling, and the vegetated landscape buffer remains under private ownership. So part of the lot can be yours on paper and unavailable in practice.

Source: City of Surrey, OCP Bylaw No. 18020, DP4 Farming Protection Development Permit Guidelines

Can a Surrey restaurant put a roof over its patio?

Yes, through the City's Outdoor Seating Area Permit, and the roof will be engineered whatever its size. Surrey states that any proposed fence or trellis greater than 1.8 metres in height and all roofs require the involvement of a Structural Registered Professional, with a Coordinating Registered Professional where there is more than one, and that all roofs require sealed and signed structural drawings. The seating area cannot sit in a required setback, 1.5 metres of sidewalk must stay clear at all times, an enclosed area needs a compliant exit gate, Planning reviews it against the site's development permit conditions, and Fraser Health reviews the drawings before submission and again before final inspection. Plan the drawing set first and the hardware second.

Source: City of Surrey, Outdoor Seating Area Permit

Roughly what does a twenty foot square patio cover come to?

No figure against a square footage, because at that scale the square footage is among the least decisive things in the job. Roof type moves it, attached against freestanding moves it more, and on a Surrey lot whether the structure is even allowed to stand where you want it can move it further than either, since anything pushed out into the yard brings its own footings and its own supply run along with it. An area like that is also well past anything the City's published shed criteria describe, so an approval path arrives with it. Send us the property and we will quote the real structure.

How should I choose an outdoor heater for a Surrey patio?

Radiant before convection, every time. An open sided structure gives warm air straight back, so the heat has to arrive on people and surfaces directly. From there the decisions are the coverage pattern at the height you can realistically mount at, fixed against freestanding, the approval mark, and the clearances to combustible material the manufacturer publishes for that exact model. We looked for a City of Surrey or Surrey Fire Services clearance or restriction covering a permanently mounted outdoor radiant heater and found none, so this page carries no Surrey specific heating figure, and the installation is set out against the manufacturer's own published clearances.

Will you deal with the City on my behalf?

No. Confirming and obtaining whatever Surrey requires stays with the property or business owner. Our part is the drawings, the sizing and the technical detail your application is assembled around, plus an early warning where a question looks like one for an engineer or for the City rather than something anybody should assume.

Working Across Surrey

We design, supply and install throughout the City of Surrey, from South Surrey and Cloverdale through Fleetwood, Guildford, Newton, Panorama Ridge, Port Kells and the City Centre. Five Eight Twelve keeps no office, showroom or yard anywhere in Surrey. Every job here is run from the Vancouver operation, and since so much of a project turns on the zone, the lot size and where a structure is permitted to stand, somebody comes out and looks at the property before a quote exists.

For an address outside Surrey, send it over and you will get a straight yes or no on coverage, instead of a padded list of place names.

Surrey, BC

Send us the yard, and we will tell you what the bylaw leaves you.

Ready to plan your project?

Describe the deck or the patio as it stands today, how you want to use it, and what currently stops you. Back comes the shortlist of systems that answer it, what each one takes to install on a lot like yours, and the handful of questions worth putting to the City of Surrey before anything is ordered.

Luxury Patio
Call UsSMS TextEmail Us